Seraph By Wadan construction photos
11 photos taken by Dubai Land Department engineers at 3 site inspections, newest first. The percentage is how much of Seraph By Wadan was built on the day of each visit.
22 July 202611% built
22 April 20261.7% built
24 September 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.