Safeer Residences 3 construction photos
25 photos from 2 site inspections, newest first. The percentage is how much of Safeer Residences 3 was built on the day of each visit.
1 July 2018100% built
13 June 201899% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.