Cove Edition Residence 6 By Imtiaz construction photos
29 photos from 6 site inspections, newest first. The percentage is how much of Cove Edition Residence 6 By Imtiaz was built on the day of each visit.
13 October 202626% built
13 July 202620% built
8 April 20266.3% built
5 February 20264.2% built
20 October 20251.1% built
2 June 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.