Cove Edition Residence 2 By Imtiaz construction photos
49 photos from 8 site inspections, newest first. The percentage is how much of Cove Edition Residence 2 By Imtiaz was built on the day of each visit.
20 October 202660% built
17 August 202650% built
3 June 202636% built
26 February 202624% built
8 October 202510.0% built
4 June 20253.5% built
4 February 20250% built
9 September 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.