Celesto Tower construction photos
10 photos from 3 site inspections, newest first. The percentage is how much of Celesto Tower was built on the day of each visit.
18 June 20263.9% built
23 March 20262.0% built
24 September 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.
.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)




.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)