The Signature construction photos
22 photos from 2 site inspections, newest first. The percentage is how much of The Signature was built on the day of each visit.
4 March 201393% built
27 September 201284% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.