Dd Stand Point construction photos
22 photos from 2 site inspections, newest first. The percentage is how much of Dd Stand Point was built on the day of each visit.
27 January 201399% built
23 September 201295% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.