33 photos taken by Dubai Land Department engineers at 6 site inspections, newest first. The percentage is how much of Eleve By Deyaar was built on the day of each visit.

24 September 202620% built

23 June 202616% built

19 March 202613% built

28 November 20259.2% built

27 November 20259.2% built

16 February 20240% built

Back to Eleve By Deyaar construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.