Eleve By Deyaar construction photos
33 photos taken by Dubai Land Department engineers at 6 site inspections, newest first. The percentage is how much of Eleve By Deyaar was built on the day of each visit.
24 September 202620% built
23 June 202616% built
19 March 202613% built
28 November 20259.2% built
27 November 20259.2% built
16 February 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.