Skip to content

Terraces Marasi Drive construction photos

51 photos from 5 site inspections, newest first. The percentage is how much of Terraces Marasi Drive was built on the day of each visit.

1 October 2024100% built

29 April 202490% built

19 October 202364% built

8 August 202346% built

6 February 202330% built

Back to Terraces Marasi Drive construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.