Bayz 102 By Danube construction photos
27 photos from 7 site inspections, newest first. The percentage is how much of Bayz 102 By Danube was built on the day of each visit.
6 October 20266.5% built
30 June 20265.9% built
23 March 20265.2% built
24 December 20254.7% built
2 October 20251.1% built
23 June 20250.3% built
3 September 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.










.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)









