Skip to content

Wynwood Horizon By Imtiaz construction photos

13 photos from 4 site inspections, newest first. The percentage is how much of Wynwood Horizon By Imtiaz was built on the day of each visit.

16 September 20269.6% built

16 June 20266.7% built

17 March 20260.6% built

30 September 20250% built

Back to Wynwood Horizon By Imtiaz construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.