Samana Mykonos Signature construction photos
69 photos from 9 site inspections, newest first. The percentage is how much of Samana Mykonos Signature was built on the day of each visit.
12 October 202686% built
14 May 202680% built
22 January 202673% built
2 October 202549% built
29 July 202544% built
26 March 202531% built
23 October 202415% built
8 May 20241.9% built
2 March 20230% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.