Victoria Residency construction photos
54 photos from 5 site inspections, newest first. The percentage is how much of Victoria Residency was built on the day of each visit.
19 December 2018100% built
8 March 201882% built
31 October 201760% built
22 June 201741% built
15 January 201720% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.