The Hub Residences By Zazen construction photos

43 photos from 7 site inspections, newest first. The percentage is how much of The Hub Residences By Zazen was built on the day of each visit.

19 October 202634% built

6 August 202627% built

22 May 202619% built

6 January 202611% built

5 December 20256.5% built

19 August 20253.0% built

9 December 20240% built

Back to The Hub Residences By Zazen construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.