Repose Residence construction photos
25 photos from 4 site inspections, newest first. The percentage is how much of Repose Residence was built on the day of each visit.
15 October 202637% built
25 June 202624% built
25 February 202616% built
31 July 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.