Skip to content

Orvessa Residences By Michel Adam construction photos

8 photos from 3 site inspections, newest first. The percentage is how much of Orvessa Residences By Michel Adam was built on the day of each visit.

10 September 20261.5% built

16 October 20250% built

26 December 20240% built

Back to Orvessa Residences By Michel Adam construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.