Azizi Amir construction photos
13 photos from 3 site inspections, newest first. The percentage is how much of Azizi Amir was built on the day of each visit.
18 November 20262.4% built
18 March 20262.4% built
19 June 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.






.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)

