Mirdif Tulip construction photos
46 photos from 6 site inspections, newest first. The percentage is how much of Mirdif Tulip was built on the day of each visit.
2 May 2016100% built
6 January 201696% built
7 September 201584% built
27 May 201569% built
22 January 201554% built
15 September 201434% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.


























.jpg&w=3840&q=75)







