Skip to content

Platinum Residence 2 construction photos

12 photos from 2 site inspections, newest first. The percentage is how much of Platinum Residence 2 was built on the day of each visit.

31 July 2016100% built

21 September 201580% built

Back to Platinum Residence 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.