Skip to content

Axis Silver construction photos

43 photos from 5 site inspections, newest first. The percentage is how much of Axis Silver was built on the day of each visit.

19 February 2018100% built

29 October 201792% built

7 May 201780% built

17 November 201665% built

16 September 201543% built

Back to Axis Silver construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.