Axis Residences 2 construction photos
14 photos from 1 site inspections, newest first. The percentage is how much of Axis Residences 2 was built on the day of each visit.
13 May 201395% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.