Samana Hills South 2 construction photos
16 photos from 4 site inspections, newest first. The percentage is how much of Samana Hills South 2 was built on the day of each visit.
28 October 202612% built
8 June 20265.3% built
10 February 20260.7% built
11 August 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.






.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)


