Muraba Residences Palm Jumeriah construction photos
17 photos from 3 site inspections, newest first. The percentage is how much of Muraba Residences Palm Jumeriah was built on the day of each visit.
29 December 2016100% built
29 October 201546% built
21 May 201518% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.


