Skip to content

Azure Residence construction photos

37 photos from 4 site inspections, newest first. The percentage is how much of Azure Residence was built on the day of each visit.

18 August 2016100% built

1 May 201697% built

29 September 201565% built

17 December 201416% built

Back to Azure Residence construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.