Skip to content

Palm Jebel Ali - The Beach And Coral Collection - Frond C construction photos

11 photos from 4 site inspections, newest first. The percentage is how much of Palm Jebel Ali - The Beach And Coral Collection - Frond C was built on the day of each visit.

13 October 20262.8% built

13 July 20261.7% built

28 April 20261.0% built

22 September 20250% built

Back to Palm Jebel Ali - The Beach And Coral Collection - Frond C construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.