Zephyra Residences construction photos

38 photos from 6 site inspections, newest first. The percentage is how much of Zephyra Residences was built on the day of each visit.

23 November 202647% built

12 May 202631% built

26 February 202620% built

17 November 202511% built

9 September 20254.6% built

10 September 20240% built

Back to Zephyra Residences construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.