Wasl By Azizi construction photos

5 photos taken by Dubai Land Department engineers at 2 site inspections, newest first. The percentage is how much of Wasl By Azizi was built on the day of each visit.

18 March 20262.0% built

24 February 20250% built

Back to Wasl By Azizi construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.