Mudon Al Ranim 3 construction photos

52 photos from 7 site inspections, newest first. The percentage is how much of Mudon Al Ranim 3 was built on the day of each visit.

20 August 2025100% built

1 May 202590% built

20 January 202571% built

24 September 202445% built

6 March 202420% built

5 September 20230.9% built

23 May 20230.3% built

Back to Mudon Al Ranim 3 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.