Skip to content

Mudon Al Ranim 1 construction photos

45 photos from 7 site inspections, newest first. The percentage is how much of Mudon Al Ranim 1 was built on the day of each visit.

28 May 2025100% built

20 January 202595% built

24 September 202478% built

6 May 202442% built

5 September 202313% built

23 May 20230.6% built

11 January 20230.3% built

Back to Mudon Al Ranim 1 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.