Beverly Grande construction photos
10 photos from 3 site inspections, newest first. The percentage is how much of Beverly Grande was built on the day of each visit.
29 September 20262.3% built
27 March 20260.5% built
22 May 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.









