Skip to content

Gate Eleven Residences construction photos

18 photos from 4 site inspections, newest first. The percentage is how much of Gate Eleven Residences was built on the day of each visit.

9 September 202631% built

30 March 202612% built

11 December 20250% built

14 May 20250% built

Back to Gate Eleven Residences construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.