Pier Point 1 construction photos

17 photos from 4 site inspections, newest first. The percentage is how much of Pier Point 1 was built on the day of each visit.

14 May 20268.3% built

8 January 20266.1% built

21 July 20250.4% built

19 September 20240% built

Back to Pier Point 1 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.