Qpoint Liwan-R019 construction photos
25 photos from 3 site inspections, newest first. The percentage is how much of Qpoint Liwan-R019 was built on the day of each visit.
6 August 201395% built
10 March 201390% built
26 September 201286% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.