Qpoint Liwan-Plot R068 construction photos
8 photos from 2 site inspections, newest first. The percentage is how much of Qpoint Liwan-Plot R068 was built on the day of each visit.
15 September 201399% built
11 November 201299% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.