Skip to content

Albero By Oro24 construction photos

34 photos from 6 site inspections, newest first. The percentage is how much of Albero By Oro24 was built on the day of each visit.

10 September 202645% built

27 March 202629% built

10 December 202523% built

19 September 202518% built

11 June 20259.6% built

15 November 20230% built

Back to Albero By Oro24 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.