Albero By Oro24 construction photos
34 photos taken by Dubai Land Department engineers at 6 site inspections, newest first. The percentage is how much of Albero By Oro24 was built on the day of each visit.
10 September 202645% built
27 March 202629% built
10 December 202523% built
19 September 202518% built
11 June 20259.6% built
15 November 20230% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.