Skip to content

Santorini Residences By Loutraki construction photos

34 photos taken by Dubai Land Department engineers at 6 site inspections, newest first. The percentage is how much of Santorini Residences By Loutraki was built on the day of each visit.

23 April 202643% built

14 January 202632% built

1 August 202520% built

17 March 202512% built

27 August 20245.2% built

26 September 20230% built

Back to Santorini Residences By Loutraki construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.