Skip to content

Maya Residences 5 construction photos

29 photos from 4 site inspections, newest first. The percentage is how much of Maya Residences 5 was built on the day of each visit.

22 November 2024100% built

13 August 202497% built

1 March 202464% built

26 September 202332% built

Back to Maya Residences 5 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.