Imperial Residence construction photos
35 photos from 3 site inspections, newest first. The percentage is how much of Imperial Residence was built on the day of each visit.
7 January 201487% built
18 July 201376% built
6 February 201367% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.













