Al Burooj Residence 1 construction photos
21 photos from 2 site inspections, newest first. The percentage is how much of Al Burooj Residence 1 was built on the day of each visit.
24 January 2018100% built
4 July 201767% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.