Vita Grande By Meteora construction photos

44 photos from 5 site inspections, newest first. The percentage is how much of Vita Grande By Meteora was built on the day of each visit.

25 February 202664% built

3 January 202563% built

14 November 202461% built

7 May 202443% built

7 November 202323% built

Back to Vita Grande By Meteora construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.