The Veranda Collection 2 construction photos
40 photos from 4 site inspections, newest first. The percentage is how much of The Veranda Collection 2 was built on the day of each visit.
31 July 2026100% built
21 May 202695% built
15 May 202526% built
11 February 20259.7% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.