The Veranda Collection 2 construction photos

40 photos from 4 site inspections, newest first. The percentage is how much of The Veranda Collection 2 was built on the day of each visit.

31 July 2026100% built

21 May 202695% built

15 May 202526% built

11 February 20259.7% built

Back to The Veranda Collection 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.