Roma Residences By Jrp construction photos
59 photos from 9 site inspections, newest first. The percentage is how much of Roma Residences By Jrp was built on the day of each visit.
30 September 202677% built
11 June 202658% built
2 March 202643% built
30 December 202538% built
1 October 202522% built
15 May 202511% built
25 February 20258.1% built
7 September 20242.2% built
8 January 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.