Platinum Residence construction photos
40 photos from 3 site inspections, newest first. The percentage is how much of Platinum Residence was built on the day of each visit.
8 April 2019100% built
10 July 201881% built
18 January 201856% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.