Ozone 1 Residence construction photos
50 photos from 7 site inspections, newest first. The percentage is how much of Ozone 1 Residence was built on the day of each visit.
14 July 202657% built
7 May 202654% built
24 December 202548% built
23 September 202539% built
3 June 202527% built
10 October 202411% built
4 March 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.