Noora Residence 1 construction photos
33 photos from 3 site inspections, newest first. The percentage is how much of Noora Residence 1 was built on the day of each visit.
26 January 201494% built
28 May 201355% built
8 October 201222% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.