H Three By Aurora construction photos
19 photos from 3 site inspections, newest first. The percentage is how much of H Three By Aurora was built on the day of each visit.
20 March 2025100% built
4 October 202480% built
1 September 202310% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.