Beverly Residence 2 construction photos

75 photos from 6 site inspections, newest first. The percentage is how much of Beverly Residence 2 was built on the day of each visit.

2 June 2026100% built

20 May 202699% built

13 April 202699% built

27 May 202588% built

9 July 202461% built

14 September 202311% built

Back to Beverly Residence 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.