Skip to content

Hyde Walk Residence By Imtiaz construction photos

45 photos from 5 site inspections, newest first. The percentage is how much of Hyde Walk Residence By Imtiaz was built on the day of each visit.

17 November 2025100% built

9 October 202599% built

22 June 202575% built

7 February 202541% built

22 November 20230% built

Back to Hyde Walk Residence By Imtiaz construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.