Viera Residences construction photos
39 photos from 4 site inspections, newest first. The percentage is how much of Viera Residences was built on the day of each visit.
29 January 2026100% built
4 August 202574% built
26 March 202548% built
21 September 202416% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.