Moonsa Residences 2 construction photos

17 photos from 4 site inspections, newest first. The percentage is how much of Moonsa Residences 2 was built on the day of each visit.

20 July 20261.0% built

2 March 20260.1% built

26 September 20250% built

12 September 20240% built

Back to Moonsa Residences 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.